Find a licensed electrician in Shelton, CT
Request a written estimate from a licensed Connecticut electrical contractor for a panel or service upgrade, EV charger, generator or repair in Shelton.
Call (203) 680-9825Request a free written estimate
Fill this out and the assigned contractor calls you back Mon-Fri 8-4 with a written estimate for your property.
Mon-Fri 8-4 callbacks · We do not sell your information · CT Lic. ELC.0200504-E1
That doesn't look like a 5-digit ZIP — you can still send the form without it.
Operated by AEQR.ai · Homes, businesses & light industrial *
Active fire, smoke, sparking or burning smell? Call 911. This form is not for emergencies.
No obligation · Texting optional, never required *
Prefer to call? (203) 680-9825. Answered any time by our automated assistant, which takes your details; a person calls back Mon-Fri 8-4. Calls may be recorded.
Shelton permits: Building Department, City Hall, third floor. Utility: United Illuminating (UI).
Shelton at a glance
- Electric utility: United Illuminating (UI), per the state DOT's utility data. [1] Utility step →
- The office is open Tuesday to Friday, 8:00am to 5:30pm. [2]
- Generator and solar jobs are separate permit types from a standard electrical permit. [3]
Electrical permits in Shelton
- Office: Building Department, City Hall, third floor, 54 Hill Street, Shelton, CT 06484 [2, 3, 4]
- How to file: Online through ViewPoint Cloud.
- Fee: $2 per $100 for the first $1,000, then $10 for each $1,000, $10 minimum, plus a $5 processing fee. A certificate of occupancy is $20 (City Code § 3-28).
- Inspections: Inspectors are available Tuesday to Friday, 8 to 9am, 1 to 2pm and 4:30 to 5pm.
Permit fees and rules across the county →
Guides: panel upgrade cost · 100 vs 200 amp service · EV chargers · standby generators · signs you need a new panel
Ready for a written estimate?
A licensed Connecticut electrical contractor prices the job after seeing it.
Request a free estimate →- CTDOT_Utilities data — https://portal.ct.gov/dot/bureaus/engineering-and-construction/engineering/facilities-and-transit/utilities — page dated 2026-09-18
- Shelton Building Department — https://cityofshelton.org/p/building-department — no date on page
- Shelton online permitting — https://cityofshelton.org/p/online-permitting — no date on page
- Shelton Code of Ordinances, Chapter 3 — https://library.municode.com/CT/Shelton/codes/code_of_ordinances?nodeId=PTIICOOR_CH3BUBURE_ARTIINGE_S3-6VISTBUCOPE — no date on page