How a service upgrade works with Eversource and United Illuminating

Call (203) 680-9825

Request a written service upgrade estimate

Fill this out and the assigned contractor calls you back Mon-Fri 8-4 with a written estimate for your house.

Mon-Fri 8-4 callbacks · We do not sell your information · CT Lic. ELC.0200504-E1

Operated by AEQR.ai · Homes, businesses & light industrial *

Active fire, smoke, sparking or burning smell? Call 911. This form is not for emergencies.

No obligation · Texting optional, never required *

Prefer to call? (203) 680-9825. Answered any time by our automated assistant, which takes your details; a person calls back Mon-Fri 8-4. Calls may be recorded.

Short version. The electrician owns the process, but the utility owns the calendar. In Eversource towns the contractor files a service request at least 15 days before the work and finishes within 60 days (the cut-and-reconnect policy that sets those windows covers overhead single-phase services up to 400A; underground and larger services are utility-scheduled, and an after-hours emergency may be repaired first with the request and permit filed within one business day); in United Illuminating towns (Bridgeport, Easton, Fairfield, Shelton, Stratford, Trumbull, Milford) the contractor files a Service Location Request, gets a UI job number, and UI sets the meter only after the town's inspection is posted. Standard residential service from Eversource is 200A single-phase.

The sequence, Eversource territory

  1. Service request. Required for "any new, relocated, upgraded, changed, removed or temporary service," including load data, before work starts (Information & Requirements §118). Replacing the meter socket, service entrance or mast counts as a change (§137). Requests are normally filed by the licensed contractor and assigned to a technician within two business days (Eversource FAQ).
  2. Permit. Town electrical permit with the service request number on it. Town fees →
  3. Cut and reconnect day. Under the Residential Cut and Reconnect Policy — which covers only overhead single-phase residential services of 400A or less; underground and larger services are scheduled by the utility — an E-1 (unlimited electrical contractor) or E-9 (residential and light-commercial contractor) electrician cuts at the weatherhead, replaces the service entrance, meter socket and panel, reconnects, and reinstalls the existing meter — common for 60–100A → 100–200A upgrades. Service request number obtained ≥15 days prior; work complete within 60 days. Emergency exception: if a service fails outside Eversource business hours, on a weekend or holiday, the policy allows the repair or replacement to proceed, provided the electrician obtains the Eversource service request number and the municipal permit within one business day (CT Building Code R105.2.1, emergency repairs).
  4. Meter socket. Must be from Eversource's approved list; all sockets require lever-operated bypass jaws with a safety flash shield (list dated September 17, 2024).
  5. Inspection. The electrician obtains the town inspector's approval as soon as the work is complete. The inspector — the Authority Having Jurisdiction — is the party that notifies Eversource of any building-code violation; unless Eversource hears of one from the inspector, it reseals or installs the meter.
  6. Reseal. Eversource reseals or installs the meter. Homeowner-permit jobs (owner-occupied single-family, I&R §114) do not qualify for cut-and-reconnect — Eversource de-energizes and reconnects after municipal approval.

The sequence, United Illuminating territory

  1. Service Location Request online (or via UI Customer Care); UI assigns a job number that the town needs for approval — Bridgeport requires the UI work order number on the permit application.
  2. Permit and work. Per UI's 2017 Guidebook (§5.4), an E-1/E-9 (or supervised E-2/apprentice) may cut and reconnect overhead single-phase services up to 200A after contacting UI; work is completed within 15 days of the service date. Homeowners may install only de-energized services.
  3. Inspection posted. "Construction acceptance" must be in UI's system before scheduling or energizing. The electrician obtains the municipal inspection and must advise UI within one business day of completing the cut-and-reconnect steps (Guidebook §5.4, step 7).
  4. Meter. UI installs the meter after municipal inspection; the old meter must not be reinstalled. Unauthorized de-energizing is billed.

Who does what

TaskHomeownerLicensed electricianUtilityTown
Load calculation, scope, estimateProvides appliance listOwns
Service request / job numberFilesIssues, assigns technician
PermitMay pull if owner-occupied (CGS §20-340)Normally pullsIssues, inspects
Cut, replace, reconnectNeverE-1/E-9 under policyOtherwise the utility
MeterEversource: reinstalls existingEversource reseals; UI installs newInspection first
Point-of-attachment / drop changesRequestsApproves; performs the drop and pole-side work
Attachment hardware (service bolt)Installs the UI-supplied bolt, anchored for 650 lb of tension (UI Guidebook §5.1)UI supplies the bolt (or the town hall stocks it); Eversource attaches its own drop hardware

What to ask before you sign

Ready for a real number?

Planning ranges are not quotes. The assigned Connecticut electrical contractor prices the service upgrade after seeing your panel, meter and service entrance.

Request a free estimate →
Sources (checked 2026-09-27)
  1. Eversource CT — Information & Requirements for Electric Service, 2024 Edition (PDF) — https://www.eversource.com/docs/default-source/ct---pdfs/ct-information-requirements-booklet.pdf — page dated 2024
  2. Eversource CT — Residential Cut and Reconnect Policy (PDF) — https://www.eversource.com/docs/default-source/ct---pdfs/cut-and-reconnect-policy.pdf?sfvrsn=db0ced62_15 — page dated 2018-05-01
  3. Eversource — Electric Service FAQ for builders and contractors — https://www.eversource.com/residential/about/doing-business-with-us/builders-contractors/electric-service-faq — no date on page
  4. Eversource — Connecticut approved meter sockets (PDF) — https://www.eversource.com/docs/default-source/doing-business/connecticut-approved-meter-sockets.pdf — page dated 2024-09-17
  5. Eversource — Homeowner guidelines — https://www.eversource.com/residential/services/construction-renovation/references-resources/homeowners-guidelines — no date on page
  6. United Illuminating — Install or upgrade service — https://www.uinet.com/account/moving/install_upgrade_service — no date on page
  7. United Illuminating — Guidebook of Requirements for Electric Service, 2017 (PDF) — https://www.uinet.com/documents/1678076/1704062/UI_Guidebook_for_Requirements_for_Electric_Service_08-17-2017_doc_16051.pdf/abb2df72-a0c1-9743-6821-f78dfae87cb8?version=1.0&t=1643355982375 — page dated 2017-08-17
  8. National cost guide — panel replacement duration — page dated 2024-12-30
  9. Connecticut electrical contractor — one-day upgrade timeline (published) — page dated 2026-06

Published · Updated · Fairfield County, CT · Every figure above is sourced in the list above, with a date where the source publishes one.

Questions homeowners ask

Can my electrician just pull the meter and do it?

In Eversource territory, only under the Residential Cut and Reconnect Policy: a licensed E-1 (unlimited contractor) or E-9 (residential/light-commercial contractor) electrician — or an E-2 journeyperson or apprentice under their supervision — may cut at the weatherhead, replace the service, reconnect and reinstall the existing meter for overhead services up to 400A — after obtaining an Eversource service request number at least 15 days ahead. Homeowners are not authorized to cut and reconnect. UI allows the same for overhead single-phase services up to 200A, but the old meter must not be reinstalled; UI installs the meter after inspection.

How long is the power off?

For a same-day panel or service replacement, Connecticut contractors describe 6–10 hours with power restored the same afternoon once the inspection passes and the meter is reset. National guides put a full service upgrade at 8–10 hours and a panel-only swap at 4–8.

What if the utility drop or pole is the problem?

Any change to the point of attachment needs Eversource approval in advance; utility-side work (drop, transformer) is scheduled by the utility and is the one part of the job neither you nor the electrician controls.

Disclosures

Who does the work. Work is performed by an independent licensed Connecticut electrical contractor · CT license ELC.0200504-E1 (verify at CT eLicense). ElectricalPanelUpgrade.net is an AEQR.ai network property and does not hold this contractor license; requests are routed to that independent contractor and provider assignment may change. Any contract and work are between you and the assigned contractor. License verified 2026-10-06. Contractor participation is by application only. Each contractor is personally vetted and interviewed by AEQR's owner, and exclusivity is earned, not purchased.

Text messaging (optional). The estimate form includes a separate SMS-consent checkbox. It is not pre-checked, and checking it is not required to submit a request or receive service. If you check it, you authorize Begolli of New York, LLC (operating as AEQR.ai, ElectricalPanelUpgrade.net) to send you text messages about your estimate request — confirmation, scheduling and follow-up. Message frequency varies (typically a few messages per request). Message & data rates may apply. Reply STOP to opt out at any time, or HELP for help. Consent is not a condition of any purchase. See our Privacy Policy (full SMS terms) and Terms of Use.

Pricing and scope. Planning ranges on this site cite dated sources (each guide lists them, with the date each was published) and are not quotes; every project is priced in writing after a site visit by a licensed contractor. Residential, commercial and light industrial electrical work in Fairfield County, CT. Your phone number goes to the one assigned contractor. We do not sell your information.

CallRequest a free estimate