Find a licensed electrician in Easton, CT
Request a written estimate from a licensed Connecticut electrical contractor for a panel or service upgrade, EV charger, generator or repair in Easton.
Call (203) 680-9825Request a free written estimate
Fill this out and the assigned contractor calls you back Mon-Fri 8-4 with a written estimate for your property.
Mon-Fri 8-4 callbacks · We do not sell your information · CT Lic. ELC.0200504-E1
That doesn't look like a 5-digit ZIP — you can still send the form without it.
Operated by AEQR.ai · Homes, businesses & light industrial *
Active fire, smoke, sparking or burning smell? Call 911. This form is not for emergencies.
No obligation · Texting optional, never required *
Prefer to call? (203) 680-9825. Answered any time by our automated assistant, which takes your details; a person calls back Mon-Fri 8-4. Calls may be recorded.
Easton permits: Building Department. Utility: United Illuminating (UI).
Easton at a glance
- Electric utility: United Illuminating (UI), per the state DOT's utility data. [1] Utility step →
- Emergency and backup generators need a Zoning Permit, with a site plan or survey showing where the generator will go. [5]
- The site plan or survey should show the generator, the house, property lines and setbacks, and screening details where they apply. A front-yard location has its own screening and enclosure conditions, so confirm the spot with the town before installation. [5]
- Searches of existing property files are done in person at the Building Department, Monday to Thursday 9:30 a.m. to 2 p.m. The $5 file-search fee is paid by cash or check, separately from the permit payment. [2]
Electrical permits in Easton
- Office: Building Department, 225 Center Road, Easton, CT 06612 [2, 3, 4]
- How to file: The town's September 2, 2025 notice says you can apply for building permits online through GovWell; the Building Department page also links to it.
- Fee: The Building Department page and its building-permit process sheet do not give an electrical permit dollar amount. After the Building Official reviews the application, the town emails you to pay by credit card. Paper applications are accepted if needed, and those are paid by credit card, not by check. The zoning fee table is a Planning and Zoning charge, separate from this permit.
Permit fees and rules across the county →
Guides: panel upgrade cost · 100 vs 200 amp service · EV chargers · standby generators · signs you need a new panel
Ready for a written estimate?
A licensed Connecticut electrical contractor prices the job after seeing it.
Request a free estimate →- CTDOT_Utilities data — https://portal.ct.gov/dot/bureaus/engineering-and-construction/engineering/facilities-and-transit/utilities — page dated 2026-09-18
- Easton Building — https://eastonct.gov/1228/Building — no date on page
- Easton news: online permitting launch — https://www.eastonct.gov/m/newsflash/home/detail/198 — page dated 2025-09-02
- Easton building permit process sheet — https://eastonct.gov/DocumentCenter/View/8951/Easton-Doc — no date on page
- Easton zoning FAQ — https://eastonct.gov/m/faq?cat=16 — no date on page